Sunday, December 20, 2009

Rain Slowdowns

We have had a couple of rains and it takes a long time for the soil to dry out. So, this week, progress was slow. The concrete will be poured in three stages, with the lower one first. The plumbing has been roughed in for the lower slab.

The driveway also got a load of fill so we can walk down in from the road now.


We were fortunate while walking around to hear and see this little guy (photo from http://www.laspilitas.com/California_birds/Kinglets/Ruby_crowned_kinglet.html).

We don't expect that a lot will happen until the holidays are over, but now that we can more easily walk onto the site, we will probably be spending some time there. With the area cleared, we can plan for the landscaping and future pool. 